Skip to content
Active roof leak?Call (914) 231-6866 — same-day response

An envelope that matches the roof.

Siding

James Hardie fiber cement, cedar, and engineered wood — with proper rain-screen detailing for the freeze-thaw Hudson climate.

Fiber cement lap siding installed with proper rain-screen detailing

How a siding project runs

  1. 01

    House-wrap assessment

    We pull a test course and assess the existing WRB before scoping the new wall assembly.

  2. 02

    Rain-screen install

    Furring strips over WRB creates a drainage plane — the detail that makes a Hardie wall last 40 years instead of 20.

  3. 03

    Trim & finish

    Azek or Boral trim, corner boards, and window casings pre-primed and field-painted to spec.

Why we do it this way

What makes a siding project from us different.

  • 01

    Full-envelope thinking

    Siding is part of the roof system. We detail step-flashing, kick-out flashing, and sidewall ice-and-water so the two assemblies work together.

  • 02

    Lead-safe renovation

    Every crew is EPA RRP certified. Pre-1978 homes are contained, wet-scraped, and HEPA-vacuumed per federal rule.

Frequently asked

Questions we hear on almost every siding call.

Ready when you are

Contact Us for a Free Roof Consultation

Free on-site inspection, no-obligation estimate, and a written report with photos — whether we end up working together or not.